mirror of
https://github.com/jgraph/drawio-desktop.git
synced 2026-11-28 14:14:21 +01:00
prepare-release commits the version and a regenerated lock to releases/vX.Y.Z and opens a PR into dev. It never tags, so the builds only start when the tag is pushed by hand after the merge. Documents the submodule bump to the public core tag before the dispatch, the review and merge, the annotated tag on the releases branch head, the 28-asset draft, why the lock floats to the newest caret matches, and the previous_version and override_audit inputs. The build-failure steps no longer re-run prepare-release, and the claim that a lagging submodule pin leaves CI builds unaffected is gone: only js/*.min.js and VERSION come from drawio-dev. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>